KitLog pro

Powered By Kitlog Pro v2.0

ONEX #54 Web Site
' style=
Date:  12-1-2013
Number of Hours:  3.00
Manual Reference:  E01
Brief Description:  2 year anniversary, EGT probe installation

Two years and 1196 hours ago today I made my first Onex part. I figure I had about 4 months of non-work periods, so about 20 months of actual work so far.

Drilled and tapped the exhaust pipes for the 5M0.8mm EGT probes. Screwed the probes directly into the thin wall pipes and they seem pretty secure. I can still use the hose clamps if needed.

Wired the four CHT probes into half of the "NAMZ" 16 pin Molex connector (www.namzccp.com). The connector is weather resistant with a silicon sealing gasket around the wires. The connector is located on the cockpit side of the firewall away from heat sources where it becomes the "cold junction" location.
' style=

5M0.8mm EGT probe screwed into exhaust.

5M0.8mm EGT probe screwed into exhaust.

' style=



"NAMZ" 16 pin connector

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.